BlueJay Solutions Brochure - SiteStak & MuckStopper - Product brochure - Page 73
SITE STAK
Presentation is everything
for Anderson Group
Michael Keeley prides himself on orderliness – and not just in how
he manages his complex and broad-reaching role as Associate
Production Director of Construction. Here, he explains why one
of the products he helped introduce to Anderson sites two years
ago is keeping them neat and tidy – and safer than ever.
I started working in construction when I
was 17 and a lot has changed in the last 25
years. Two of the major shifts have been
in the emphasis we now put on safety and
site presentation – things that, almost three
decades ago, didn’t factor as high on the list
of priorities as simply getting the job done.
The SiteStak system provides a solution
to the problem of storing and stacking
underground drainage pipes and 昀椀ttings
for quick access. Before we discovered
this product, pipes would be held in a
compound – sometimes a couple of miles
away from the place where they were
needed – or in smaller piles on site, often
making the area look messy.
SiteStak holds up to 25 lengths in each
secure container, keeping everything tidy,
providing an easier stock control system,
reducing accidents, removing mess and
improving e昀케ciency.
We started working with the product two
years ago after the manufacturer BlueJay
agreed to make some extra modi昀椀cations to
meet our needs.
We asked for the equipment to have
a lockable lid and lockable toolbox
attachment to keep our
equipment and product
safe, and to incorporate
a workstation where
pipe can be cut
and prepared for
installation. This
cutting tool allows us
to put a saw into a
groove to meet the
pipe and cut exact
lengths – such as the
600mm length needed
for a rocker pipe.
Call us 01420 559888 1144
|
bluejaysolutions.co.uk