BlueJay Solutions Brochure - SiteStak & MuckStopper - Product brochure - Page 36
RESULTS IN THE FIELD
When the roads and sewers team from M&J Evans Construction Ltd
(North West) began work at a 400-unit Taylor Wimpey development site
in David Whitby Way in Crewe, they knew the extended period of the
development project would present challenges in terms of keeping
manholes and road gullies free of silt.
They decided to proactively install
MuckStopper products across the site
as soon as the 昀椀rst layer of asphalt had
been laid on the roadways. Removing the
steel plates that protected the drainage
system during the asphalting operation,
they installed the MuckStopper units in the
chambers before setting the ironwork in
place as normal.
Justin Evans, Project Manager for the site,
also commented that many drain systems
today incorporate a hydro brake system
that slows storm-water before it reaches
main streams and waterworks. Having
MuckStopper in place, Justin observed, will
also prevent silt from blocking the hydro
brakes and getting into main waterways,
with clear environmental bene昀椀ts.
Road sweepers are essential for
controlling muck on a construction site,
but they generate a 昀椀ne slurry that seeps
through the small gaps on manhole
covers and into road gullies. From there,
it enters the chambers and main drains,
and has to be jetted out before the project
is completed. With MuckStopper in place
as a barrier, the chambers and drains will
remain silt-free for the entire project.
MuckStopper also drew the attention of
Taylor Wimpey directors on a visit to the
site, who were impressed by its capabilities
and potential.
36
On completion of the project, Justin and his
team will simply remove the ironwork from
the manholes and road gullies, extract the
MuckStoppers and replace the ironwork
before the asphalt crews complete the road
surface, leaving the MuckStoppers to be
redeployed to another construction site.
Stop the Muck. Keep the Flow.