BlueJay Solutions Brochure - SiteStak & MuckStopper - Product brochure - Page 32
REAL SITE EXAMPLE: BARRATT DEVELOPMENTS
Barratt Developments acquired a
10-hectare site in Thornton just eight
miles from Liverpool city centre and
planned to build 268 dwellings.
Read how MuckStopper protected
the drainage systems on the site
during construction.
Converting a green昀椀eld site into a new
housing development requires the
installation of all services, drainage systems
and roads from scratch, and during the
construction process, a tremendous
amount of dirt and silt is churned up and
昀椀nds its way into manholes, inspection
chambers and road gullies.
Open road gully gratings and dislodged or
damaged chamber covers are no barrier
to this sediment and road sweepers only
exacerbate the problem, so drainage
systems soon become blocked.
Unblocking drains is a time-consuming
and dangerous task that requires sending
personnel into con昀椀ned spaces and if
the blockage is particularly severe, needs
the assistance of a professional drain
cleaning company.
Barratt Developments wanted to protect
all of the new drainage systems and their
workers on the site and to prevent delays
and additional costs to the project.
After discovering the innovative
MuckStopper range of drainage
protection products, Barratt
Developments quickly
realised the bene昀椀ts
these would
bring.
32
Stop the Muck. Keep the Flow.