BlueJay Solutions Brochure - SiteStak & MuckStopper - Product brochure - Page 17
MUCKSTOPPER
Installation
Guide
Step 1
Before installing the
manhole cover & frame,
install the MuckStopper,
one course of bricks (or
one pre-cast section)
below the frame. Bed
the MuckStopper frame
in place with mortar.
This guide is for installing the
MuckStopper with a 100mm
deep manhole cover and frame.
1
2
3
4
Step 2
Install the next course
of brickwork (or precast section) above
the MuckStopper.
Complete installation
of the manhole cover
and frame as per
the manufacturer’s
guidelines above the
MuckStopper.
Step 3
At the end of the
project, remove the
MuckStopper and any
debris it has collected,
leaving the drains free
of blockages.
Step 4
Replace the manhole
cover and frame and
set 昀椀nal levels before
surfacing as usual.
Call us 01420 559888
|
bluejaysolutions.co.uk
17